Case Study 1 – AIM0066 Papenham Green

SCOPE OF WORK:

Mainlaying

  • Excavate, backfill and reinstate off site trenches for Gas/Water/Electric
  • Lay and commission LP gas connection
  • Lay and commission LV electric network
  • Lay and commission Standard HDPE water network
  • Install all mains and cable laying in 3 Phases. Any additional phasing will be charged as a variation to this contract

Services & Connections:

  • Connect 83 single electric connections
  • Connect 83 single gas services
  • Connect 83 single water service

 

Case Study 2 – AIM0020 Bredon Road 

SCOPE OF WORK:

Mainlaying

  • Excavate, backfill and reinstate off site trenches for Gas/Water/Electric
  • Lay and commission LP gas connection
  • Lay and commission LV electric network
  • Lay and commission Standard HDPE water network
  • Install all mains and cable laying in 3 Phases.

Services & Connections:

  • Connect 68 single electric connections
  • Connect 68 single gas services
  • Connect 68 single water service

Case Study 3 – AIM0263 Melksham

SCOPE OF WORK:

Mainlaying

  • Excavate, backfill and reinstate off site trenches for Gas/Water/Electric
  • Lay and commission LP gas connection
  • Lay and commission LV electric network
  • Lay and commission Standard MDPE water network
  • Install all mains and cable laying in 4
  • Fully Establish an 11Kv-400/230V Secondary 500kVA Sub-station capable of supporting your Development

Services & Connections:

  • Connect 150 single electric connections
  • Connect 150 single gas services
  • Connect 150 single water service

 